| 2026 |
FOUR LANING OF AGRA-ALIGARH SECTION FROM KM. 0.000(JUNCTION OF NH-34 ALIGARH) TO 28.000 NEAR ASROI VILLAGE INHATHRAS, IN THE STATE OF UTTAR PRADESH ON HAMMODE UNDER NH (O) SCH |
KRC Infra Projects Pvt. Ltd. |
1,00,000 SQM |
| 2025 |
ROAD SAFETY IMPROVEMENT OF CRITICAL JUNCTIONS ONMUZAFFARNAGAR-HARIDWAR SECTION OF NH-334 FROM KM143+000 TO KM 196+000 IN THE STATE OF UTTAR PRADESH &UTTARAKHAND ON EPC MODE UNDER NH(O |
M/S HIMALAYAN CONSTRUCTION |
25,000 SQM |
| 2025 |
Six-laning of the Kagal- Satara section of NH-48, PKG-2, in the state of Maharashtra, to be executed on BOT mode under BharatMala Pariyojana |
Adani/DP Jain |
35,000 SQM |
| 2025 |
Construction of RS Walls for Pachora - Jamner GC Work and Extension up to Bodwad in Maharashtra |
Ferro Concrete Construction (India) Pvt. Ltd. |
30,000 SQM |
| 2025 |
Construction of 4-Lane Elevated Corridor and at-grade improvements from Design ch.- 0+000 to Design ch.- 19+870 of Danapur-Bihta section with providing connectivity to the existing ROB near Danapur station (0.231 km), 1.35 km ramps & at-grade improvements to 4-Lane section on Danapur side and Upgradation of existing 2-Lane carriage way to 4-Lane carriageway from Design ch.- 19+870 to Design ch.- 23+500 to Bihta- Koliwar section (Total length- 25.081 kms) in the state of Bihar on EPC Mode. |
Ceigall India Ltd. -- YFC Project Pvt. Ltd. JV |
35,000 SQM |
| 2024 |
Construction of 4 Lane access-controlled Greenfield National Highways (NH-119D), starting from its junction with NH-19 (Old NH-02) near village Amas connecting Ramnagar, Kachhi Dargah, Kalyanpur (Hajipur), Tajpur and terminating at its Junction with NH-27 near village Bela Nawada (Darbhanga) under Bharatmala Pariyojana in the state of Bihar - Package-1 from village Amas (Design chainage - 00+000) to village Shivrampur (Design chainage - 55+002), Total Length - 55.002 Km. |
MEIL Amas – Shivrampur Roadways Pvt. Ltd. OR Megha Engineering & Infrastructures Ltd. |
75,000 SQM |
| 2024 |
Six Laning of start of Kollam Bypass (Design km.- 486.000) – Kadambattukonam (Design km.- 517.250) section of New NH-66 (Old NH-47) in the state of Kerela on Hybrid Annuity Mode under Bharatmala Pariyojana. |
Shivalaya Construction Company Pvt. Ltd. |
40,000 SQM |
| 2024 |
Four Laning of Tarsod-Fagne (Package-IIB) section of NH6 from km.- 422.700 to km.- 510.000 in the state of Maharashtra to be executed on Hybrid Annuity Mode nder NHDP Phase -IV. |
Kalyan Toll Infrastructure Ltd./ AGROH Infrastructure Developers Pvt. Ltd. |
68,000 SQM |
| 2024 |
Construction of Vehicular Underpass with Service Road in Km.- 176+787 For Khed Railway Station, Gunde Phata in Km.- 191+900 and Construction of Vehicular Over Pass at 129+400 in Nadgaon village on National Highway No.- 66 in Raigad and Ratnagiri District in the state of Maharashtra. |
Kalyan Toll Infrastructure Ltd. |
35,000 SQM |
| 2024 |
Balance work of Four Laning of Panvel-Indapur section of NH-66 (Old NH-17) from km.- 42.300 (KASU) to km.- 84.600 (Indapur) in the statae of Maharashtra under Bharatmala Pariyojana. |
- |
- |
| 2024 |
4-Lanning of Shahpur Bypass to Muktainagar section of NH-753L from design ch.- 186.000 to design ch.- 216.278 in the state of Madhya Pradesh on Hybrid Annuity Mode. |
Muktainagar – Shahpur Corridor Pvt. Ltd. (BNA Infrastructure Pvt. Ltd.) |
70,000 SQM |
| 2024 |
Construction of 4-Lane access controlled Greenfield Highway section of NH-163G (Khammam-Vijayawada) from- V.Venkatayapalem village at Design ch.- 220+480 km. to Brahmanapalli(K) village at Design ch.- 250+400 km. (Total Length - 29.920 km) under other Economic Corridor (NH(O) Programme on Hybrid Annuity Mode in the state of Telangana (Package-I). |
Dinesh Chandra R. Agrawal Infracon Pvt. Ltd. |
1,00,000 SQM |
| 2024 |
Four laning of NH-119 from Behsuma at Km 39.250 (Ex. Km 39+240) To Bijnor at Km 78.810 (Ex. Km 86+590) (Design Length= 39.560 Km) in the state of Uttar Pradesh on Hybrid Annuity Mode. |
KRC Infra Projects Pvt. Ltd. |
80,000 SQM |
| 2024 |
Construction of Four Lane access-controlled Greenfield National Highway (NH-119D), starting from its Junction with NH-19 (Old NH-02) near village Amas connecting Ramnagar, Kachhi Dargah, Kalyanpur (Hajipur), Tajpur and terminating at its Junction with NH-27 near village Bela Nawada (Darbhanga) under Bharatmala Pariyojna in the state of Bihar- Package- II from village Shivrampur (Design Ch.55+002) to village Ramnagar at its Junction with SH-78 (Proposed Patna Ring Road) (Design Ch.109+324) Total Length – 54.322 Km. |
MEIL Ramnagar Four Lane Roadways Pvt. Ltd. OR Megha Engineering & Infrastructures Ltd. |
1,55,000 SQM |
| 2024 |
Construction of Shohratgarh Bypass (Design Length - 6.273 Km) to Two Lane with Paved Shoulder on NH-730 (Starts near Ch.- 413+700 and ends near Ch.- 419+000) under Engineering, Procurement & Construction (EPC) Mode in the state of Uttar Pradesh. |
Bhardwaj Unibuild Pvt. Ltd. |
30,000 SQM |
| 2024 |
Construction of 6-Lane Chittoor - Thatchur (Greenfield Alignment) from Km.- 0.000 to Km.- 43.800 on Hybrid Annuity Mode under Bharatmala Pariyojana in the state of Andhra Pradesh and Tamil Nadu (Package-I). |
KCC Chittoor Highways Pvt. Ltd. |
25,000 SQM |
| 2024 |
Six Laning of Varansi- Aurangabad section of NH-2 from km.- 786+000 to km. 871+000 (Length - 85km.) in the state of Uttar Pradesh & Bihar under NHDP Phase V on DBFOT (Toll) Basis. |
SGSR Pvt. Ltd. |
10,000 SQM |
| 2024 |
Khed - Sinnar VUP (NH-60) Design and construction of vehicular underpass with approaches at Khodad junction (km.78.600) and Ambikhalsa junction (km.113.150) on Khed Sinnar section of NH-60 (old NH-50) in the state of Maharashtra as standalone project on EPC mode. |
New India Structure Pvt. Ltd. / NVR |
5,000 SQM |
| 2023 |
Construction of 4-Lane greenfield highway from km.- 134+737 to km.- 163+253 (on the RME - Right Median Edge) and km.- 135+003 to km.- 163+253 (on the LME - Left Median Edge) Bhopal Sagar (Sagar Link Road - Berkhedi - Sagar) under Bharatmala Pariyojana in the state of Madhya Pradesh on EPC Mode. |
P. D. Agarwal Infrastructure Ltd. |
50,000 SQM |
| 2023 |
Development of 4/6 Lane Access Control Expressway from Design Chainage Km.- 515.000 to Km. 528.300 (Kunjwani to Sidhra Section of NH-44) and from Design Chainage Km. 550.900 to Km. 566.520 (Domel to Katra Section) on Hubrid Annuity Mode under Bharatmala Pariyojna in the UT of J&K (Phase II - Package XVII). |
APCO Maa Vaishno Expressway Pvt. Ltd. |
50,000 SQM |
| 2023 |
Connectivity to Jewar International Airport Construction of 6-Lane Greenfield Connectivity to Jewar International Airport from DND - Faridabad - Ballabhgarh Bypass KMP Link - SPUR to Delhi Mumbai Expressway on Hybrid Annuity mode in the state of Haryana and Uttar Pradesh under Bharatmala Pariyojana. |
APCO Jewar Expressway (P) Ltd. |
1,00,000 SQM |
| 2022 |
Widening and Strengthening for Improvement and Up- gradation of NH-709A Garhmukteshwar (Chainage - 83+200 of NH-24) to Meerut (Chainage- 9+860 of NH- 235) including connector to NH-119 Package-XII in the state of Uttar Pradesh. |
Tata Projects Ltd. |
60,000 SQM |
| 2022 |
Detailed Engineering Design for Construction of 4/ 6-Lane Access- Controlled Expressway (Package- XIV) from junction near Balsua with NH-54 to junction with Hiranagar road near village - Gurha Baildaran (Km. 423+500 to Km. 468+100) of Delhi - Amritsar - Katra Expressway in the state of Punjab and UT of J&K. |
Megha Engineering & Infrastructures Ltd. |
2,50,000 SQM |
| 2022 |
4-Laning of Indore to Raghavgarh section of NH-59 (Indore - Harda, Package-1 Stretch) from MR-10 junction on NH-3 Bypass Ch. - 0.250 to Raghavgarh Ch.- 26.903 (Design 26.653 Km) under Bharatmal Pariyojana Phase-I (EC) in Madhya Pradesh on EPC Mode. |
P. D. Agarwal Infrastructure Ltd. |
80,000 SQM |